TeamIdea Group, on behalf of its subsidiary, TIGROUP, hereby announces

12

6 min

TeamIdea Group, on behalf of its subsidiary, TIGROUP, hereby announces

Mariia Starosvetskaia
Mariia Starosvetskaia PR Manager, TeamIdea Group

TIGROUP has launched a large-scale ERP transformation program for Zeppelin International AG, aimed at modernizing its financial landscape and ensuring long-term sustainability of IFRS reporting.


ZIA1.png

The project includes a technical conversion of the existing ERP system to SAP S/4HANA and the full transition of IFRS reporting capabilities from a legacy architecture with increasing operational and maintenance challenges to a modern, scalable platform.


Throughout the transformation, Zeppelin International AG assumed a strong governance role, ensuring structured risk management and the consistent consideration of internal control requirements.

Eliminating Critical Business Risks

Prior to the transformation, IFRS reporting for Zeppelin International AG relied on a separate SAP Corporate Finance (CFin) solution to support IFRS accounting and reporting requirements.


ZIA2.png

At the same time, the existing SAP ECC system is approaching end-of-support in 2027, making further operation increasingly risky and costly.


The program was initiated to ensure continuity of financial reporting, simplify parallel accounting approach and establish a future-proof ERP foundation.

Project Scope and Delivery Approach

TIGROUP is delivering the project using a brownfield conversion approach, enabling a controlled transition to SAP S/4HANA while preserving existing business processes.


ZIA3.png

Key components of the transformation include:

S/4HANA Conversion

Technical conversion of ERP ZIA system and adaptation of integrations, including online banking.


IFRS Accounting Implementation

Parallel accounting using S/4HANA Additional Ledger, setup of IFRS Chart of Accounts and valuation adjustments for inventory and receivables.


IFRS Reporting Transformation

Replacement of CFin-based reporting with S/4HANA and integration with BW for core reporting, including P&L and Balance Sheet, inventory and fixed assets, accounts receivable, sales and order backlog, and intercompany transactions.


BW Integration and Data Migration

Reimplementation of BW extractors and interfaces, migration of data into S/4HANA, and elimination of obsolete and unused code.


The project intentionally excludes redesign of business processes, focusing on a fast and efficient technical transformation.

Structured Delivery and Timeline

ZIA4.png

The program follows SAP Activate methodology and is structured into four phases: Prepare, Explore, Realize, and Deploy.


The delivery includes multiple system conversion cycles (Sandbox, DEV, QAS, Final Test, Production), ensuring quality control and risk mitigation at every stage.


The Go-Live was successfully completed in January, 2026, with system transition performed during a controlled downtime window.


“The key challenge of this project was to ensure a seamless transition from a a legacy architecture with increasing operational and maintenance challenges to a stable S/4HANA environment without disrupting existing business processes. The brownfield approach allowed us to combine speed, control, and technical efficiency,” says Tatiana Shangina, CEO at TIGROUP.

Business Impact

ZIA5.png

The transformation establishes a robust foundation for financial stability and compliance.


Business and Compliance
Elimination of dependency on external CFin system and improved reliability of financial reporting.

IT
Transition to a supported S/4HANA platform, simplified system landscape, and reduction of technical debt.

Operations
Improved integration with BW systems, standardized reporting processes, and increased system stability.

A Platform for Future Growth

The new S/4HANA-based architecture provides Zeppelin International AG with a scalable digital core, enabling further development of financial and analytical capabilities.

The platform supports future regulatory requirements and creates a foundation for long-term business growth.

zia6.png

Read also

мужчина несет коробки

How SAP’s Cloud Changes the Project During Transition

мужчина несет коробки

SAP Sapphire Madrid 2026: From ERP to the Autonomous Enterprise

мужчина несет коробки

TeamIdea Joined RELEX Live Nashville 2026 as a Gold Sponsor

мужчина несет коробки

A Simple Guide to SAP’s Upgrade and Update Policy for SAP S/4HANA

мужчина несет коробки

TeamIdea Group and RELEX Solutions to Host First RELEX Forum in Kazakhstan

мужчина несет коробки

Case study: how major poultry producer gained 2% margin increase by implementing IBP platform

мужчина несет коробки

TeamIdea Showcases SAP–RELEX Integration Solution at EuroShop 2026

мужчина несет коробки

SAP S/4HANA Business Partner Conversion: How to Handle Legacy Customer/Vendor Links in BD001 and BC001

мужчина несет коробки

SAP S/4HANA Migration: Brownfield, Greenfield, and Selective Data Transition (SDT/Bluefield)

мужчина несет коробки

Don’t wait: the window for a savvy SAP cloud migration is closing soon

мужчина несет коробки

Case study: how major automotive parts producer had optimized stock through adapting IBP for Inventory

мужчина несет коробки

How major Agribusiness reached more than 75% forecast accuracy on SKU-day level by implementing Integrated Business Planning

мужчина несет коробки

How Relex Helps CPG Producers Boost Revenue with Smarter Demand Forecasting and Leaner Planning

мужчина несет коробки

Case Study: How Top Russian Retailer Magnit Increased Forecast Accuracy and Availability While Reducing Stock by up to 17%

мужчина несет коробки

RELEX Recognized as a Leader in the 2025 Gartner Magic Quadrant for SCP

мужчина несет коробки

Success Story: Warehousing and Transportation Management Systems for Sberlogistics by TeamIdea

мужчина несет коробки

What Will Change in Your Warehouse After Implementing a WMS?

мужчина несет коробки

Success story: How TeamIdea automated the largest DC of Kimberly-Clark in the CIS

мужчина несет коробки

Medservice Plus: WMS implementation for one of the largest pharmaceutical DCs in Kazakhstan by TeamIdea

мужчина несет коробки

WMS vs. ERP: Which System Suits Your Warehouse Best?

Contact us today to start your journey towards a fully optimized and integrated digital supply chain.

Fill in the field
Fill in the field
Incorrect Email
Fill in the field
Fill in the field
Invalid phone number
Fill in the field

By continuing, you accept the terms Personal data processing policies